Products
  Drying ironers
   G line
      Ø 500 mm
     Ø 325 mm
     Ø 270 mm
     G 26-35
  Rotary ironers
   E line
     WHY CHOOSING THE E LINE
     E Ø 250 mm
     E Ø 300 mm
   GMP line
     GMP 2000 IE
     Ø 250 mm
     Ø 300 mm
     Ø 200 mm

 

Gas change (drying ironers).
1) Change the nozzle installing the appropriate one for the new gas type, according to instructions given in the use and maintenance handbook.
2) Modify the gas inlet and outlet pressure acting on the solenoid valve (pos. 5 for the inlet pressure and pos. 6 for the outlet pressure), setting the pressures as indicated in the u&m handbook.
Make sure that the gas supply pressure is constant: pressure rushes (even a few mbar) may affect the correct burner working and therefore the temperature control. The pressure must be measured using a digital manometer, since the one working with H2O is not precise enough.
3) When setting is completed, seal the solenoid valve.
GMP COMMERCIALE Srl    |    Dealer Site
Novità Azienda Contatti Invia Posta Send a Mail NEWS COMPANY CONTACTS ACCESSORIES FAQ